

Data Centers
THE MACHINES’ APPETITE
THE DEAL
In September and October 2026, the AI data-center boom became America's loudest land war: Amazon pledged $1 billion to communities near its data centers as more than 100 moratoriums brewed, the Senate killed a ratepayer bill 57-43, and OpenAI, SoftBank, Blackstone and five unions launched a multimillion-dollar campaign to head off local bans.
THE ARCHIVE
History · cartoons · headlines
THE TIMELINE16 sourced events
WATER, POWER, MORATORIUMS: THE DATA CENTER BECOMES A BALLOT QUESTION
The AI data-center boom collided with water scarcity, electric bills, and local democracy. Amazon pledged $1 billion to host communities as more than 100 moratoriums brewed; the Senate killed ratepayer protections 57-43; Utah's 40,000-acre project stalled after three political backers lost their primaries. The industry fought back with a multimillion-dollar campaign alongside five unions — and Google launched four AI chips into orbit.
Sep 9, 2026
MASSACHUSETTS TO DATA CENTERS: BRING YOUR OWN CLEAN POWER
Massachusetts hit data centers with new clean-power rules, forcing the industry to reckon with its grid footprint. States started treating AI's electricity appetite as a permitting problem.
SOURCES: TechCrunchreported
Sep 9, 2026
QUALCOMM AND AMAZON SIGN A MULTI-GENERATION CHIP PACT
Qualcomm announced a multi-generational product collaboration with Amazon to build next-generation AI data center infrastructure. The chipmaker and the cloud giant locked themselves into co-developing the silicon for the AI buildout.
SOURCES: Qualcommfirst-party
Sep 12, 2026
NVIDIA FINDS ANOTHER $100 BILLION FOR OPENAI'S BUILDOUT
Nvidia planned a $100 billion OpenAI data-center buildout, per Reuters. The company selling the shovels is now financing the mine — a bet that AI needs capacity faster than anyone can permit it.
SOURCES: Reutersreported
Sep 12, 2026
THE UAE PUTS AIR DEFENSES ON ITS AI DATA CENTERS
The UAE revised its AI data center plans after Iranian attacks, with sources telling Reuters the Emirates weighed air defenses for cloud infrastructure. Cloud computing got its own bunker doctrine.
SOURCES: Reutersreported
Sep 14, 2026
TEXAS TO DATA CENTERS: REPORT YOUR WATER OR LOSE YOUR PERMITS
Texas moved to penalize data centers for water violations, Reuters reported. In a state that knows drought, AI's thirst became a permitting condition.
SOURCES: Reutersreported
Sep 15, 2026
TRUMP CALLS AI DOOM A 'HOAX'
President Trump called AI risks a 'hoax' and alleged a 'SICK conspiracy' against AI and data centers, per the Associated Press. The federal guardrail on offer: a president who says the fix is his own 'high IQ.'
SOURCES: Associated Pressreported

Sep 20, 2026
CRUSOE RAISES $3.9B FOR TRUCKABLE 'AI FACTORIES'
Crusoe raised $3.9 billion to build massive data centers and small modular 'AI factories,' TechCrunch reported. Compute demand is so intense the factories themselves are being designed to move.
SOURCES: TechCrunchreported
Sep 20, 2026
GOOGLE, NVIDIA AND ANTHROPIC WANT 100 MORE GIGAWATTS
Google, Nvidia and Anthropic want Emerald AI to find space on the grid for more data centers — 100 more gigawatts, TechCrunch reported. The grid is now the bottleneck, and the three companies building AI's future are asking to share it.
SOURCES: TechCrunchreported
Sep 21, 2026
320,000 JOBS AROUND DATA CENTERS. 730,000 IN PROFESSIONAL WORK.
The Economist reported an AI jobs boom: roughly 320,000 jobs around data centers and 730,000 in professional work. The jobs apocalypse is postponed — the construction crew got there first.
SOURCES: The Economistreported
Sep 22, 2026
THE AI JOB: 30,000 STEPS A DAY, SNIFFING FOR BURNING EQUIPMENT
The Wall Street Journal went inside one of America's data centers: workers walk 30,000 steps a day, sniffing for burning equipment. The most advanced industry on earth still runs on human noses.
SOURCES: Wall Street Journalreported
Sep 29, 2026
THE INDUSTRY BUILDS AN ARMY: GIANTS + FIVE UNIONS
OpenAI, SoftBank, Blackstone and five unions joined forces in a multimillion-dollar campaign to head off data-center moratoriums, Axios reported. The counterattack against the local backlash has a war chest and a labor alliance.
SOURCES: Axiosreported
Sep 29, 2026
THE DATA-CENTER PARTY GOT INTERRUPTED
A pro-data-center party in D.C. was interrupted by protesters shouting 'Thank you for using all of our water!', with the crowd chanting 'USA! USA!' The backlash has found its chant.
SOURCES: Yahoo / Business Insiderreported
Sep 30, 2026
THE SENATE KILLED THE DATA-CENTER BILL 57-43
The Senate blocked a bill addressing data-center costs on a 57-43 vote, per Reuters. Schumer called the Republican alternative 'a toothless messaging bill.' Your power bill keeps paying for AI's grid.
SOURCES: Reutersreported
Oct 1, 2026
GOOGLE FIRES THE FIRST SALVO OF THE ORBITAL DATA-CENTER RACE
Google launched four TPUs into orbit to test AI data centers in space, CNN reported. The test satellite shuts down every 20 minutes so it doesn't overheat. Rural towns said no to data centers; Google's answer was space.
SOURCES: CNNreportedStartup Fortunereported
Oct 2, 2026
UTAH'S 40,000-ACRE DATA CENTER HAS NO TENANT
Utah officials approved a 40,000-acre AI data center — the biggest in the world, per The Verge — after deliberations held out of public view. Three political backers lost their primaries; the project is now stalled.
SOURCES: The Vergereported
Oct 4, 2026
AMAZON'S ANSWER TO 100+ MORATORIUMS: $1 BILLION
Amazon will invest $1 billion over five years in US data center communities as more than 100 moratoriums brew, Reuters reported. A billion dollars to make the neighbors like the building that drinks their water.
SOURCES: Reutersreported
MORE CARTOONS44 original cartoons

THE LANDLORD’S LITTLE CONDITION

THE POLITE POWER GRAB

THE $3.2 TRILLION RUG

THE GATE CLOSES

KICKED OUT BY THE BALLOT BOX

THE TOWNS SAID NO

ONE MORE BOND

THE LOAD-BEARING DEBT

MARVELL'S $115 BILLION BET ON THE LIGHT INSIDE AI

SAME BUILDING, NICER NAME

THE SOVEREIGN SLICE

THE SMALLEST BOUNCER

THE AI LANDLORD

THE CLOUD GETS FIRED

THE GOLDEN GOODBYE

RICHEST MAN FOR A DAY.

THE SECOND JOB.

THE VOTELESS SHARE

THE $30B QUESTION MARK

THE GRID SAYS WAIT

THE WORLD'S BIGGEST SCIENCE PROJECT.

PULL THE PLUG

THE WAVE RIDER

GOOGLE BOUGHT THE POWER GRID

THE DATA CENTER IS NEXT.

MORE INTELLIGENCE AHEAD.

THIS LAND IS AI'S LAND

THE TAX BREAK NOBODY'S USING.

THE AI BOOM IS RUNNING OUT OF ELECTRICITY

FROM FLARE TO SERVER FARM.

AWS GETS PAID EITHER WAY.

THE WEEKEND CEO

DATACENTER, POP. 0

BACK ONLINE

THE GREAT BRITISH DRAIN

PLANTING DOLLARS

THE DATA FIRE SALE

THE $1 BILLION ANSWER

SPACE IT IS

A BILLION SAYS YES

The Meter Feeds the Monster

Closed Loop Spritz

THE EXTENSION CORD





